Construction of the Country Club of Virginia Aquatic Center includes demolition of all existing pool structures and new construction of approximately 10,600 square feet of indoor space, including locker rooms, aquatics offices, pool equipment rooms and snack bar / kitchen, all with brick veneer and detailed trim to match existing clubhouse. The project includes five new pools- an adult pool, recreation pool, competition pool, diving pool and baby pool- with approximately 39,500 square feet of pool decks and multiple pergolas and shade structures. Above the roof structure of the locker rooms and snack bar is a dining terrace with panoramic views of the aquatics center and the golf course. The new facility uses a blend of new materials and brick matching the original 1910 facility.

The project site had no laydown or staging area and could only be fed from one side. The locker rooms were built into a hillside requiring 20-foot-tall concrete retaining walls. The project was completed on schedule despite having precipitation on 45% of the days of the project duration. The project was completed with only 1% change orders.

Client Testimonial

William Harris, The Country Club of Virginia

"The ability of your team to coordinate the work of so many trades within a challenging site is amazing. I cannot imagine working with a better contractor on the project."

Project Info

Owner: Country Club of Virginia
Architect: Worley Associates Architects
Location: Richmond, VA
Project Size: 50,000 SF
Completion: May 2009